Bull NovaScale T830 E1 Betriebsanweisung Seite 64

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 325
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 63
User Guide
64
www.bull.com
NovaScale T810 E1 Rack Installation Kit
Assembly
This section provides the assembly instructions for mounting the server into a standard
19-inch rack cabinet.
Note: The server shown in the pictures may be slightly
different from your server system.
Unpacking the Rack Installation Kit
Although the rack installation kit is inspected and carefully packaged at the factory,
damage may occur during shipping. Follow these steps for unpacking.
1. Visually inspect the shipping containers; notify your carrier immediately of
any damage.
2. Carefully remove the rack mounting hardware and verify the parts.
Note: The quantities noted below are subject to change
without notice.
2 sets of support rail assem-
blies (1 front and 1 rear part for
each)
Figure 20: Rail assembly front and rear parts
(right side shown)
6 (minimum) self-tapping
screws (TCB M5) for support
rails front and rear parts
assembling
Figure 21: Self-tapping screws
Seitenansicht 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 ... 324 325

Kommentare zu diesen Handbüchern

Keine Kommentare